Hudson River Park, Phase 1: Piers 45, 46, 51, + Upland Areas

New York
Architetti Paesaggisti
Abel Bainnson Butz, LLP
Anno
2003
Costo
1M - 100M

Heralded as Manhattan’s largest new park since central park was constructed in the 1800’s Hudson River Park stretches from Battery Park City to 59th Street along the western Manhattan shoreline. ABB’s initiation of Phase I signified the reclamation of NYC’s waterfront from an inaccessible and deteriorating industrial waterfront to a public open space destination offering various recreational opportunities.

As the project’s prime consultant, ABB led a multi-disciplinary team of eleven consultants. ABB provided design services from programming through construction administration for two distinct project aspects: waterfront structures and upland park. The waterfront design included restoration of the existing historic granite bulkhead, reconstruction of relieving platforms, and reconstruction of three piers for recreational use. The upland park design included all on-grade portions of the park and all finishes for the piers including architectural elements, softscape and hardscape treatments, and all supporting infrastructure.

The linear upland park includes a continuous waterfront esplanade constructed of distinctive granite and bluestone pavement. Spatial diversity is achieved via open lawn areas back-dropped with lush plantings, subtle use of topographic variations, and creation of plaza spaces. Plaza spaces respond to park entrances, pier connections, river overlook areas, and esplanade features such as the pedestrian bridge at the historic bow notch. A magnificent granite fountain, a display garden, a dog run, two comfort stations and a food concession are located within the upland park. The three piers offer varied recreational opportunities. Pier 45 features a natural lawn for passive recreation, two tensile fabric shade structures, a tensile fabric pavilion, and an interactive water feature. Pier 46 features a synthetic turf playfield, seating beneath the shade of a tree bosque, and a picnic grove. Pier 51 features play structures including a water play area, a ship’s prow jutting out over the edge of the pier, and a shade canopy for respite.

Read more here: https://www.abbnyc.com/hudson-river-park-segment-4

Progetti collegati

  • Wellness Bogn Sedrun
    Walter Bieler AG
  • 6280.CH Coworking Hub
    Evolution Design
  • Hohes Holz auf der Lichtung | Neubau Büro- und Verwaltungsgebäude für die Ziegler Group
    Brückner & Brückner Architekten
  • Turning Gray into Green : Meishe River Greenway and Fengxiang Park, Haikou,China
    Turenscape
  • Tongnan Dafosi Wetland Park
    Turenscape

Rivista

Altri progetti di Abel Bainnson Butz, LLP

Gantry Plaza State Park (Queens West, Stage II)
Long Island City
Manhattan Districts 1/2/5 Garage Green Roof
New York
Hofstra University Shuart Stadium and Field Hockey Stadium
Hempstead
Madison Square Park
New York
3 Bryant Park Plaza
New York
JHS 72Q
Queens